Saturday, May 5, 2012

Progressing Right Along

The new hospital is taking shape, and the different areas are now flushing out.

 Here you see the sides going up on the building,
 and this area will be where physical therapy will be located.  The two pictures below are also part of the new physical therapy area.


 The picture above and the two below will be the front of the new hospital.


 Above is the addition of siding insulation being put on the building, and below shows the pipes being
 added for either heating and cooling or something else.

 The pictures above and below show what the back side of the building is beginning to look like.  From maps inside the clinic, this area is where deliveries will be made.
You will also notice the vents coming out of the top of the building.  The roofers have been up on the top of the building for the last few weeks.

It is beginning to take shape, but it will still be two years before it is finished.  After the outside is all enclosed, I will not be able to put up anymore pictures, so I'll have to see what else is happening around town.

Sunday, March 25, 2012

Continuing changes

Construction continues and the new hospital is beginning to take shape as can be seen in the attached photos.

 The girders are going up . . .
 

 and the structure is taking form.

This is the old parking lot, and it will be the location of the new therapy section of the clinic/hospital.

Saturday, February 18, 2012

Construction continues

The old is out and the new is in.

No longer can patients access the clinic through the main doors.
 Even the patient parking has been moved.
Now, the new door and parking are open for use.

 Basic construction is also continuing on the new building as well.


Now there is also an indication were the heart of the maintenance section of the new hospital will be located.  Notice all the pipes protruding from the ground.
It still has a long way to go, but at least it is taking shape, even if it is slowly.

Monday, January 30, 2012

New Addition

The top and bottom picture show the beginnings of drives that have some concrete poured for them.  Not sure if these will be drives to the front door, or to some other place in the hospital.

 The following pictures are the beginning of the hopsital structure.  It is located on the south side of the pre-existing clinic.  Things are beginning to take shape, and work is on going.  Considering it is in the 60's today, the workers have a nice day for construction.



Keep watching and I will keep posting as progress continues.

Tuesday, January 3, 2012

Hosptial Construction

Work on the new hospital is in happening, but as of now it is mostly dirt work.



  Fences are up to protect the area; of course, when the Big Bad Wolf, oops I mean wind, blows, the fences go down.






As of today, there are holes, mud, and supplies going on at the sight.